The Project contemplated the construction, operation and closure of a leaked tailings deposit on land located on land owned by CAP Mining, south of the Pellet Plant, commune of Huasco, Atacama region, Chile. The deposit considered a storage capacity of 14.6 million tons of tailings, equivalent to 7.6 million cubic meters.

The Project was designed to suspend the discharge of tailings into the sea and construct a filtered tailings pond using pressure filters.

 
  • PMC participated since 2018 as a consulting company and counterpart in all stages of the project, from Conceptual Engineering (Hatch), feasibility (Fluor), Feasibility (Worley) and Commissioning (CMP).
  • The project had a double challenge: on the one hand, to find a technology that would allow superfine tailings to be filtered with a P80 size of 34um and with 40% less than 7.5um, and on the other hand, to have the project in operation in September 2023, meeting all the requirements: engineering, financing, environmental permits and construction stages.

 

OUR SERVICES

COMMITTED

TO OUR CLIENTS

Our services help the mining industry and the communities that surround it. We believe in improving processes to achieve a lower impact on the environment and communities. Every day, we support our clients in improving their operations and being the cleanest possible.

Our practices

We are committed to working with Integrity to do what is right for our clients.

Our Clients